OUR EXPERIENCE
Our Clients
With 19 years of industry experience in ICT Infrastructure Services, CISB installations cover a large base in Malaysia that involves various industries. Since inception, CISB has developed a wide and varied spectrum of clients. These includes Government related agencies, Telco companies, corporate organizations, computer manufacturers, commercial distributors and agents as well as general business users.
Computers
Technology
Telecommunication
Engineering
Construction
Communication
Transportation
Healthcare
Education
Technology
Communication
Healthcare
Computers
Telecommunication
Transportation
Education
No | Job Description | Honourable Client |
1 | MAHB Network Refresh To supply, deliver, and install 6,12,36,48,144 core outdoor multimode cables c/w Patch Panel, Patch Cord for high end server, switches and SAN equipment. 100km of fiber cables pulled. | MALAYSIA AIRPORTS SDN BHD / HUAWEI |
2 | Supply, deliver, install, integrate, testing and commissioning of new fiber optic cables complete with associated accessories between passenger stations, Wisma Monorail and Monorail Old Depot. 15 km of fiber cables installed. (13 Stations) | MONORAIL / AJ BOSS |
3 | (AWOS) To supply, install, 3 core 25 mm power cables for automated weather observing system at Runway 3 KLIA. Inclusive, utility mapping, trenching, excavation 100mm HDPVC pipe, 100mm GI pipe , ACAD drawing, testing and documentation. (2.4km of power cables) | MALAYSIA AIRPORTS SB / RUNWAY 3 |
4 | BHS KLIA2 : To supply and install 36,12 and 6 core single mode (28km) fiber cable for Baggage Handling System for server upgrading exercise. Inclusive of Fiber patch panel, SC connectors , termination, testing and documentation. | MALAYSIA AIRPORT SDN BHD / C TWO ENGINEERING |
5 | To design ,supply and install 6 & 12 core OM4 multi mode Low Smoke Zero Halogen cables for high end swiches , server and SAN equipment. Together with patch panel , patch cord, testing and documentation. | MAMPU DATA CENTRE / IRIS |
6 | To design, supply and install UTP Cat 6A cables c/w Cat 6A Patch panel, Patch cord, for high end server, switches and SAN equipment. | MAMPU DATA CENTRE / IRIS |
7 | To design, supply and install MPO fiber trunk 48 core cables ,Patch panel and patch cables. Patch cord, for high end server, switches and SAN equipment. | MAMPU DATA CENTRE / IRIS |
8 | To design,supply,install,testing, commissioning Cat 6 and cables and other associated works for CCTV camera including maintenance during defects lability period for the Airport integrated security and safety system. (AIS3) | MALAYSIA AIRPORTS / G3 GLOBAL BERHAD |
9 | AIS3 : To supply and install, testing, commissioning of 6,12,24,36 core fiber cable between ser rooms 90km of cables installed. | MALAYSIA AIRPORTS / G3 GLOBAL BERHAD |
10 | Subang Airport : Design, supply, Testing and Commissioning of video surveillance system ( VSS ) including CCTV camera, switches, fiber cables for Control Post 2,5,6 & 7. | SUBANG AIRPORT |
11 | IRIS : Site survey - 243 sites To provide engineering and logistics services to survey, gather information and report on the current Structured cabling system (UTP and Fiber Cabling), IT Equipment and power socket conditions. | NiiSE / IRIS |
12 | RMA : Return Merchandise Authorization (RMA) and Firmware license subscription for network infrastructure for Malaysia Airports Sdn Bhd at Airports in peninsular Sabah & Sarawak. (19 airports) | MALAYSIA AIRPORTS SDN BHD |
13 | ACDM : To supply, deliver, install , testing and commissioning of network cable complete with accessories for Airport collaborative decision making (A-CDM) system in KL International Airport. (KUL) | UTW / MALAYSIA AIPRORTS SDN BHD |
14 | TNB : TNB projects at : TNB Seri Manjung , TNB Kuala Kangsar and TNB Sungai Petani General works, Logistics & Mobilization To supply, install, test and termination AC cable (3 Phase) c/w commando plug, terminated to Terminal Block at equipment rack with additional Earthing. | TNB /XCESS NETWORK |
15 | Kerry JB : To supply and install 6 core Multimode OM4 fiber optic cable from Server Rack | TNB /XCESS NETWORK |
16 | To supply ,deliver , install fiber outdoor cables inclusive of engineering services. Installation was done along the runway. | ISMASTURUS SDN BHD / MALAYSIA AIRPORTS SDN BHD |
17 | To provide engineering services to test and make good existing fiber cables inclusive of replacing connectors and make good of connection at Runway 1 and Runway 2. | PUNCAK TEKNOLOGI SDN BHD / MALAYSIA AIRPORT SDN BHD |
18 | Scope of work : Installation Fiber Optic 144C x 4 Cables BTN – Northern 13 Station Systems works package SBK-S-07 : Engineering, procurement, construction, testing and commissioning of Telecommunication system. | APEX COMMUNICATION SDN BHD / MRT LINE 1 |
19 | Installation of UGW Commercial Mobile Telecommunication System (CMTS) Systems works package SBK-S-07 : Engineering, procurement, construction, testing and commissioning of Telecommunication system. | APEX COMMUNICATION SDN BHD / MRT LINE 1 |
20 | Installation of Cabling works – Station 6
Systems works package SBK-S-07 : Engineering, procurement, construction, testing and commissioning of Telecommunication system. | APEX COMMUNICATION SDN BHD / MRT LINE 1 |
21 | Installation of Signaling Cable & Fiber Optic cables The Engineering , Procurement, Construction testing and commissioning of system works for Ampang (AMG) Line Extension project. | CMC ENGINEERING / LRT LINE 2 |
22 | Installation of Cabling works – Station 1 Systems works package SBK-S-07 : Engineering, procurement, construction, testing and commissioning of Telecommunication system. | APEX COMMUNICATION SDN BHD / MRT LINE 1 |
23 | Installation Fiber Optic 144C x 12 Cables , Commercial Comm (7 Station UGW ) Systems works package SBK-S-07 : Engineering, procurement, construction, testing and commissioning of Telecommunication system. | APEX COMMUNICATION SDN BHD / MRT LINE 1 |
24 | Installation Fiber Optic 144C – Commercial Comm 32 Station - Northern , UGW & Southern) Systems works package SBK-S-07 : Engineering, procurement, construction, testing and commissioning of Telecommunication system. | EVD DYNAMICS SDN BHD / MRT LINE 1 |
25 | Installation of GPS Cabling and Equipment ( Station BUBS, PASS & COCH ) Systems works package SBK-S-07 : Engineering, procurement, construction, testing and commissioning of Telecommunication system. | APEX COMMUNICATION SDN BHD / MRT LINE 1 |
26 | MRT LALUAN 2 - SSP - KULS - (V204) - KUCHAI LAMA BMS/EAC Equipment Installation, termination and testing include Sub-DB, Equipment Rack & component, cabling works between BMS/EAC (or any other room define as main equipment room for EAC System)Room to TER and any cabling works related within the room including cable containment. | APEX COMMUNICATION SDN BHD / MRT LINE 2 |
27 | IOT Project To supply , deliver, install UTP Cat 6 cable (1800 points) for 3D sensors. Installation of 3D sensors (1800 nos) Cat 6 patch panel, patch cables, c/w termination, testing and documentation. | MALAYSIA AIRPORTS / MUTIARA SMART SDN BHD |